Work is moving at a pace now. The roof structure is pretty much complete, with soffets, barge boards, vents all in place. There is even some felt! Plaster has been stripped from the bedrooms in the old section of the house. Gable walls have been rebuilt. Next is getting the veluxs fitted so the rest of the roof can be felted and then it will be on with the slate!